- Material construction: Made of high-quality polyester, soft, light, and quick drying. With an elastic drawstring at the waist and triangular lining, skin-friendly, loose, and comfortable to wear
- UNIQUE DESIGN: These Hawaiian-style men's swim shorts have a short mesh-lined design that won't feel tight when you put them on. The pineapple pattern is brightly colored and will not fade, crack, peel, or shrink
- Men's swim trunks: Beach trunks are great for beach surfing, vacation, diving, swimming, bathing, walking, training, running, yoga, night swimming, or other activities or sports, for outdoor leisure and indoor daily wear in any season
- PERFECT GIFT: This will make a great men's swim trunks gift. You'll get compliments when you wear these swim trunks. High-quality swim trunks are a must-have in any man's wardrobe and a perfect gift for family and friends
- Size Tip: Read the size chart carefully before you buy. If you want a loose, comfortable fit, we suggest you get a size large